Cha-am service area and Tha Yang rest stop proposed for M8

by Online Reporter | Nov 26, 2026 | Hua Hin News

Share this

Drivers heading south towards Hua Hin on the proposed M8 motorway would pass two places to stop in Phetchaburi province. The Department of Highways has outlined plans for a rest area in Tha Yang and a motorway service area about 21 kilometres further south in Cha-am district.

The department presented the proposed locations at a public meeting in Phetchaburi on Thursday, 26 November. The meeting followed a consultation in Hua Hin the previous day on the 61-kilometre section of motorway that would run from Wang Khrai in Tha Yang district to Wang Phong in Pran Buri.

For southbound drivers, the first stop would be in Klat Luang, about five kilometres from the start of the section. The plans place the Tha Yang rest area at kilometre 125.6 and the Cha-am service area at kilometre 146.7 in Huai Sai Nuea, inland from Cha-am town. From the service area, it would be another 12 kilometres to the proposed Hua Hin interchange at Hin Lek Fai.

According to Phetchaburi Post’s report of the meeting, the project design includes parking, toilets, places to eat, fuel, electric vehicle charging and first aid. The report does not specify which facilities each site would offer.

Where the M8 would run

Hua Hin Today’s English-language map shows the proposed route in green. Starting at Wang Khrai, where it would connect with the M8 section from Pak Tho, the motorway would run south through Tha Yang and Cha-am districts before entering Prachuap Khiri Khan at Hin Lek Fai. The map marks both proposed stops in Phetchaburi, along with a further rest area at Thap Tai, south of the Hua Hin interchange.

As Hua Hin Today reported on Wednesday in its guide to how the proposed M8 motorway would link Cha-am and Hua Hin, drivers heading into Hua Hin would leave the motorway at Hin Lek Fai and join Highway 3218. Those continuing south would pass through Thap Tai before reaching the Pran Buri interchange at Wang Phong, where the motorway would connect with Highway 37.

For communities along the route in Phetchaburi, the design includes bridges at Highway 3410, five rural roads and several local roads. Among the crossings identified at Thursday’s meeting were the access road to Kaeng Krachan airfield and the road serving Moo 1 in Ban Tha Mai Ruak.

The project remains at the design and environmental assessment stage. The Department of Highways plans further meetings with residents to discuss how to reduce the impact on communities along the route. Its preliminary timetable puts construction between 2033 and 2036, with a possible opening in 2037.

Hua Hin Today Newsletter