Hua Hin drain cleaning on 13 August: routes to avoid

by Online Reporter | Aug 12, 2026 | Hua Hin News

Share this

Hua Hin drain cleaning work will take place on Thursday, 13 August, with motorists and residents advised to avoid three affected routes while the work is under way.

Hua Hin Municipality’s Sanitary Engineering Division said cleaning and high-pressure flushing of drainage pipes will be carried out as part of ongoing efforts to improve drainage and reduce flooding during the rainy season.

Routes affected by Hua Hin drain cleaning

The work will take place along the following routes:

  • Hua Hin Soi 72, from Soi 72 through to Soi 52
  • Hua Hin Soi 78
  • Hua Hin Soi 110

The municipality said the work is intended to remove blockages, improve the efficiency of the drainage system and help reduce the risk of flooding and standing water during periods of heavy rain.

Motorists and residents are advised to avoid the affected routes while work is taking place, as machinery and municipal vehicles will be operating in the area.

Hua Hin Municipality apologised for any inconvenience and thanked the public for their cooperation.

For more information, contact the Sanitary Engineering Division of Hua Hin Municipality on **0 3251 3914**.

Hua Hin Today Newsletter